HOUSESRENDERINGRender · Protect · Enhance

Northern Ireland

Pebbledash & Roughcast in Tyrone

New pebbledash and roughcast render — matching existing dash or specifying a fresh application.

Our pebbledash & roughcast work in Tyrone starts with a free survey, because guessing at a render specification is how jobs go wrong.

Across Tyrone, rural stone farmhouses, brick terraces and modern estates dominates, and driving rain and frost damage on exposed upland properties is what we are called out to most often. Local conditions bring wet with exposed upland conditions in the Sperrins, and that has a direct bearing on which systems are worth specifying.

Local factor. The sperrin uplands add altitude and frost to already high rainfall, which is a demanding combination for any external finish.

Is pebbledash & roughcast right for a Tyrone property?

Choose dash for exposed, coastal and high-rainfall locations, for matching existing dashed elevations, and where minimum maintenance matters most.

That decision gets made at the survey, not on the phone. We will tell you plainly if a different system would serve the building better — including when a cheaper one would.

Guide price and specification

Guide price£58–£88 per m²
Applied thicknessBacking coat plus dash
Curing / drying3-7 days between coats
Guarantee15 years
CoverageAll of Tyrone — 6 towns and cities

Indicative only, excluding scaffold, stripping and repairs. Try the guide-price tool for a range based on your property.

What is included

  • Dry dash and wet dash options
  • Aggregate colour matching
  • Spar, flint and granite chippings
  • Traditional roughcast (harling)
  • Excellent weather resistance
  • Very low maintenance
  • Hides minor substrate variation
  • Matches existing dash on repairs

Pebbledash & Roughcast across Tyrone

Pebbledash & Roughcast in Tyrone

Tell us about the property and we will call you back to arrange a survey.

Free survey · no obligation · fixed written quote

Guaranteed workmanship
Free written survey
System-warranted builds
UK-wide coverage
Fixed price, no surprises

What happens next

Four steps from enquiry to finished wall

Free survey

We visit, test the substrate, measure up and identify what caused any existing failure.

Written quote

An itemised fixed price with the system named, materials specified and scaffold included.

Booked in

An agreed start date, scaffold arranged, and a clear run of days set aside for your job.

Finished and guaranteed

Site cleared, scaffold struck, guarantee documents and system warranty issued.

FAQs

Pebbledash & Roughcast in Tyrone — questions

Does pebbledash need painting?

No. The aggregate provides the colour and finish. It can be painted, but that then commits you to a repainting cycle it did not previously need.

How long does a rendering job take?

A typical three-bedroom semi is usually one to two weeks on site including scaffold, preparation, application and finishing. Weather, wall condition and the system chosen all move that.

Do I need planning permission to render my house?

Usually not on a standard house, but you will if the property is listed, in a conservation area, or if rendering would significantly change its appearance. We flag it at survey.

Will you need scaffolding?

For anything above single storey, yes — it is safer and produces a better finish than working off ladders or towers. Scaffold is included and itemised in the quote.

How long before I can paint new render?

Through-coloured systems need no painting at all. Sand and cement should cure for around 28 days before masonry paint goes anywhere near it.

Do you take a deposit?

For most domestic jobs we take a deposit to cover materials and scaffold, with the balance on completion. Terms are set out clearly in the written quote.

Pebbledash & Roughcast quotes across Tyrone

Free survey, honest advice on whether this is the right system, and a fixed written price.

Call Get a quote