Larne, Antrim
Brick Slip Cladding in Larne
Brick slip systems giving an authentic brick face over insulation or an existing rendered wall.
We carry out brick slip cladding across Larne and the surrounding Antrim area throughout the year.
Antrim is characterised by Victorian brick terraces, harled cottages and postwar estates, with driving rain and dash render failure on exposed elevations the recurring theme on the properties we survey.
The area sees wet with strong Atlantic and Irish Sea exposure, which is the single biggest factor in how long any render lasts here. Dash render is close to universal on northern irish housing, and matching existing dash is the most common requirement on repair work.
When brick slip cladding is the right call. Choose brick slips where planning, conservation or street character require a brick face, or where you want brick detailing over an insulated wall.
Guide price in Larne
| Guide price | £150–£240 per m² |
|---|---|
| Applied thickness | Slip plus adhesive and backing |
| Guarantee | 25 years |
Indicative only. The guide-price tool gives a range for your property; the survey gives the fixed price.
What the job includes
- Genuine clay and concrete slips
- Mechanical and adhesive fixing
- Corner slips for authentic returns
- Full pointing to match brickwork
- Works over EWI systems
- Wide brick range and colour match
You get a written, itemised quotation after the survey, with the specification named so you can compare like for like.
Also covering near Larne
Brick Slip Cladding in Larne
Tell us about the property and we will call you back to arrange a survey.
What happens next
Four steps from enquiry to finished wall
Free survey
We visit, test the substrate, measure up and identify what caused any existing failure.
Written quote
An itemised fixed price with the system named, materials specified and scaffold included.
Booked in
An agreed start date, scaffold arranged, and a clear run of days set aside for your job.
Finished and guaranteed
Site cleared, scaffold struck, guarantee documents and system warranty issued.
FAQs
Brick Slip Cladding in Larne
Will brick slips fall off?
Not when installed on a proper carrier system with mechanical fixing as well as adhesive. Failures come from adhesive-only fixing onto unsuitable substrates.
How long does a rendering job take?
A typical three-bedroom semi is usually one to two weeks on site including scaffold, preparation, application and finishing. Weather, wall condition and the system chosen all move that.
Do I need planning permission to render my house?
Usually not on a standard house, but you will if the property is listed, in a conservation area, or if rendering would significantly change its appearance. We flag it at survey.
Will you need scaffolding?
For anything above single storey, yes — it is safer and produces a better finish than working off ladders or towers. Scaffold is included and itemised in the quote.
How long before I can paint new render?
Through-coloured systems need no painting at all. Sand and cement should cure for around 28 days before masonry paint goes anywhere near it.
Free survey in Larne
We will confirm whether brick slip cladding suits your walls before quoting a price.