HOUSESRENDERINGRender · Protect · Enhance

Tiverton, Devon

Basement Tanking in Tiverton

Cementitious tanking and cavity drain systems for basements, cellars and below-ground rooms.

If you are weighing up basement tanking in Tiverton, the starting point is what your walls are actually built from.

The prevailing picture in Devon is cob and thatch, stone farmhouses and extensive coastal housing. That means cement render on cob causing structural decay comes up more here than almost anywhere else.

Local conditions bring high rainfall and exposed coastal conditions, and that has a direct bearing on which systems are worth specifying. Cob is unforgiving — it must be finished in lime, and cement rendering over cob is one of the most damaging things that can be done to a devon property.

When basement tanking is the right call. Choose tanking for cellar and basement conversions, persistently wet below-ground rooms, and any space you intend to make habitable.

Guide price in Tiverton

Guide price£115–£195 per m²
Applied thicknessMulti-coat cementitious system
Guarantee20 years

Indicative only. The guide-price tool gives a range for your property; the survey gives the fixed price.

What the job includes

  • Cementitious tanking slurries
  • Cavity drain membrane systems
  • Sump and pump installation
  • Type A and Type C waterproofing
  • Fillets and junction detailing
  • Withstands hydrostatic pressure

If a cheaper specification would do the job, we will say so. If it would not, we will tell you why.

Also covering near Tiverton

Basement Tanking in Tiverton

Tell us about the property and we will call you back to arrange a survey.

Free survey · no obligation · fixed written quote

Guaranteed workmanship
Free written survey
System-warranted builds
UK-wide coverage
Fixed price, no surprises

What happens next

Four steps from enquiry to finished wall

Free survey

We visit, test the substrate, measure up and identify what caused any existing failure.

Written quote

An itemised fixed price with the system named, materials specified and scaffold included.

Booked in

An agreed start date, scaffold arranged, and a clear run of days set aside for your job.

Finished and guaranteed

Site cleared, scaffold struck, guarantee documents and system warranty issued.

FAQs

Basement Tanking in Tiverton

How long does a rendering job take?

A typical three-bedroom semi is usually one to two weeks on site including scaffold, preparation, application and finishing. Weather, wall condition and the system chosen all move that.

Do I need planning permission to render my house?

Usually not on a standard house, but you will if the property is listed, in a conservation area, or if rendering would significantly change its appearance. We flag it at survey.

Will you need scaffolding?

For anything above single storey, yes — it is safer and produces a better finish than working off ladders or towers. Scaffold is included and itemised in the quote.

How long before I can paint new render?

Through-coloured systems need no painting at all. Sand and cement should cure for around 28 days before masonry paint goes anywhere near it.

Do you take a deposit?

For most domestic jobs we take a deposit to cover materials and scaffold, with the balance on completion. Terms are set out clearly in the written quote.

Free survey in Tiverton

We will confirm whether basement tanking suits your walls before quoting a price.

Call Get a quote